Q 1 : What is the length of the Mumbai-Ahmedabad Bullet Train Corridor ?
The total alignment of bullet train corridor from Mumbai to Ahmedabad is 508 km. 
For more details, please visit: https://nhsrcl.in/en/about-us/about-nhsrcls
Q 2 : How much is the total alignment for bullet train project in Gujarat, Maharashtra and Dadra & Nagar Haveli ?
In Gujarat, the total alignment is 348 km, Dadra & Nagar Haveli: 4 km and in Maharashtra: 156 km
For more details, please visit: https://nhsrcl.in/en/about-us/about-nhsrcls
Q 3 : How many stations are planned on Mumbai Ahmedabad bullet train corridor ?
There are 12 stations planned along the alignment i.e. Sabarmati, Ahmedabad, Anand, Vadodara, Bharuch, Surat, Bilimora, Vapi in Gujarat and Boisar, Virar, Thane & Mumbai in Maharashtra.
For more details, please visit: https://nhsrcl.in/en/about-us/about-nhsrcls
Q 4 : What will be the maximum speed of the bullet trains on the Mumbai-Ahmedabad bullet train corridor ?
The maximum operating speed of bullet train will be 320 km/hour
For more details, please visit: https://nhsrcl.in/en/about-us/about-nhsrcls
Q 5 : What is the expected travel time between Mumbai and Ahmedabad for the corridor ?
The entire journey will be completed in about 2 hours and 7 minutes with limited stops (at Surat, Vadodara and Ahmedabad) and 2 hours 58 minutes with all stops (at Sabarmati, Ahmedabad, Anand, Vadodara, Bharuch, Surat, Bilimora, Vapi, Boisar, Virar, Thane & Mumbai)
For more details, please visit: https://nhsrcl.in/en/about-us/about-nhsrcls
Q 6 : What is the total land required for the project and how much has been acquired ?
Out of 1390 hectares of land earmarked for the alignment, 430 hectares is in Maharashtra and 960 hectares is in Gujarat and Union Territory of Dadra & Nagar Haveli. 100% of land has been acquired for the project.
Q 7 : Which technology has been selected for MAHSR Corridor ?
One of the best global technologies in High-Speed Rail- the Japanese Shinkansen technology has been selected for the Mumbai-Ahmedabad bullet train corridor
For more details, please visit: https://nhsrcl.in/en/project/safety-features
Q 8 : How many mountain tunnels will the bullet train corridor have ?
Total seven mountain tunnels are being constructed for the corridor. Out of which six are in Maharashtra and one in Gujarat
Q 9 : How many river bridges are planned for the bullet train corridor ?
24 river bridges are being constructed as part of the alignment, of which 20 are in the state of Gujarat and 4 bridges in the state of Maharashtra
Q 10 : How many steel bridges are planned for the bullet train corridor ?
28 steel bridges have been planned along the corridor spanning over National and State Highways, Irrigation Canals and Railway Tracks
Q 11 : What technique is being used to speed up construction of the Mumbai-Ahmedabad Bullet Train Corridor ?
In order to expedite the viaduct construction, the Full Span Launching Method (FSLM) is being used, besides the Segmental Launching Method.
Q 12 : What is the length of India’s first underground/undersea rail tunnel ?
A 21 km long tunnel is being constructed in Mumbai, Maharashtra which includes 7 km long undersea tunnel. This is the first undersea rail tunnel which will start from Mumbai and come out at Shilphata in Maharashtra.
For more details, please visit: https://nhsrcl.in/en/project/project-highlights
Q 13 : What new track system is being introduced for the first time in India with this project ?
The Mumbai-Ahmedabad Bullet Train project will have J-slab track system of ballastless track based on the Japanese Shinkansen track system. This is for the first time, the J-slab ballastless track system is being used in India.
Q 14 : How many rolling stocks depots are planned for bullet train corridor ?
The Mumbai Ahmedabad Bullet Train Project will be serviced by three Rolling Stock depots located at Sabarmati and Surat in Gujarat and Thane in Maharashtra.
For more details, please visit: https://nhsrcl.in/en/project/maintenance
Q 15 : Which is the largest and mother depot for bullet train corridor ?
The Sabarmati Rolling Stock depot is the largest of the three depots with an area of about 83 hectares
For more details, please visit: https://nhsrcl.in/en/project/maintenance